CLEVELAND (AP) -- The Browns plan to have their locker room rebuilt and their stadium ready for Cleveland's first preseason game after a waterfall containing thousands of gallons of water and some sewage flooded the eight-year-old structure recently.
Old pipes in Cleveland's water system are largely to blame, city and stadium officials said Wednesday. Iron deposits flaked off the inside of the pipes and clogged toilet valves, causing a 160,000-gallon holding tank -- necessary for when thousands of fans go to the restrooms at halftime -- to overflow.
Old pipes in Cleveland's water system are largely to blame, city and stadium officials said Wednesday. Iron deposits flaked off the inside of the pipes and clogged toilet valves, causing a 160,000-gallon holding tank -- necessary for when thousands of fans go to the restrooms at halftime -- to overflow.
Comment