Fitzpatrick'sbeard
08-30-2011, 06:59 PM
my friend is one of the workers that is doing the renovation of the Sabres locker rm. He snapped this picture and sent me it in e-mail
it's going to be a fireplace in the locker room (probably to dry the players equipment)
http://p.twimg.com/AYBSBXNCAAInYB4.jpg
http://2.cdn.nhle.com/sabres/images/upload/2011/08/20110830-Interior-Pavilion.jpg
new stainless steel countertops on the freshly-painted blue and gold pillars in the 100 Level (ignore the red paint; that will be replaced by gold).
http://3.cdn.nhle.com/sabres/images/upload/2011/08/20110830-Interior-SabresStore.jpg
the new lettering on the satellite Sabres Store location next to section 101. Another project that they are hoping to have completed in time for the regular season is the addition of beverage shelves and TV’s in the bathrooms.
http://sabres.nhl.com/club/blogpost.htm?id=2433
it's going to be a fireplace in the locker room (probably to dry the players equipment)
http://p.twimg.com/AYBSBXNCAAInYB4.jpg
http://2.cdn.nhle.com/sabres/images/upload/2011/08/20110830-Interior-Pavilion.jpg
new stainless steel countertops on the freshly-painted blue and gold pillars in the 100 Level (ignore the red paint; that will be replaced by gold).
http://3.cdn.nhle.com/sabres/images/upload/2011/08/20110830-Interior-SabresStore.jpg
the new lettering on the satellite Sabres Store location next to section 101. Another project that they are hoping to have completed in time for the regular season is the addition of beverage shelves and TV’s in the bathrooms.
http://sabres.nhl.com/club/blogpost.htm?id=2433